Ruixin Energy Equipmnet

Innovation Excellence

Manufacturer from China
Verified Supplier
5 Years
Home / Products / Wireline Running Tool /

Wireline W Running Tools 1.5inch ~4inch Insert "C", "B" , And "W" Lock Mandrel Or Plugs

Contact Now
Ruixin Energy Equipmnet
Visit Website
City:baoji
Province/State:Shaanxi
Country/Region:china
Contact Person:MrsSelina Qiang
Contact Now

Wireline W Running Tools 1.5inch ~4inch Insert "C", "B" , And "W" Lock Mandrel Or Plugs

Ask Latest Price
Video Channel
Brand Name :RuiXin
Model Number :1.5inch~4inch
Certification :API
Place of Origin :China BaoJi
MOQ :1
Payment Terms :T/T
Supply Ability :1 set 1 weeks
Delivery Time :2-3 weeks
Packaging Details :Wooden Box
NAME :Wireline W Running Tools 1.5inch ~4inch Insert "C", "B", and "W" lock mandrel or plugs.
SIZE :1.5inch~4inch
FISHING NECK :1.187inch~2.313inch
CONNECTION :15/16-10UN~1-1/16-10UN
Max O.D :1.38inch~3.5inch
Applicable tool :"C", "B", and "W" lock cores or plugs.
MATERIAL :Alloy Steel&Nickel Alloy
OPERATION :Wireline Operation And Slickline Operation
more
Contact Now

Add to Cart

Find Similar Videos
View Product Description

Wireline W Running Tools 1.5inch ~4inch Insert "C", "B", and "W" lock mandrel or plugs.

Product overview

The W-type running tool is used to insert "C", "B" and "W" lock mandrel or plugs into the tubing. It is mainly composed of the upper joint, the sleeve, the elastic claw, the center rod, the shear pin seat, the elastic cylindrical pin and the shear pin combination.

Common technical parameters

SIZE FISHING NECK Max O.D CONNECTION
1-1/4" 1" 1.19" 5/8-11UN
1-1/2" 1.187" 1.38" 15/16-10UN
2"(2-1/2") 1.375" 1.5" 15/16-10UN
3" 1.75" 2.25" 1-1/16-10UN
3-1/2" 2.313" 2.625" 1-1/16-10UN
4" 2.313" 3.5" 1-1/16-10UN

Method of application

Prepare the shear pin before use, the upper thread of the W running tool is connected with the tool in series, and the lower elastic claw is loaded into the appropriate position of the lock mandrel (plug) mandrel. The W running tool is then lowered into the appropriate position along with the lock mandrel (plug). Then the wire is quickly lifted, and the main cone of the lock mandrel (plug) can make the slip bite the wall of the tubing,Continuing to jar upward, the main cone continues to push the top of the slip towards the wall of the tubing and cut the coupling shear pin on the W running tool. In this process, the sealing cone causes the sealant cylinder to expand and squeeze against the wall of the tubing to seal. Finally, pull out the W- runninh tool to complete the release.

Wireline W Running Tools 1.5inch ~4inch Insert

Any size can be customized according to customer requirements.

About Baoji RuiXin Slickline Tools

Baoji Ruixin Energy Equipment Co., Ltd. was established in 2012. It is an IS0: 9001-2015 and API Q1 system certified technology research and development organization specializing in the design and manufacture of steel wire, cable and coiled tubing tools. With strong new product research and development capabilities, it has obtained 12 national utility model patent certificates and 1 invention patent certificate. Undertook two prefecture-level and provincial-level scientific research projects. Our products include wireline wireline wellhead blowout prevention equipment, wireline downhole tools and coiled tubing downhole tools. At present, we have provided professional equipment and technical support to more than 50 oilfield service companies in various regions at home and abroad.

Strict quality control system

Steel wire working tools are certified by API, and all manufacturing are strictly in accordance with API system, including quality control management, environmental management and occupational health and safety management. For each wire working tool and each part, we have achieved traceability from raw materials, production process to product shipment.

Hard work, after-sales service

On-site technical guidance exchanges with each other. Our sales and technical personnel communicated well with front-line engineers and technical experts on the job site, and solved technical problems such as material selection, sealing structure optimization, and accident handling in complex environments. And carried out many technical exchanges and friendly cooperation. We have done a good job of product after-sales service for customers, and we provide customers with more satisfactory services. We would like to thank more and more customers for their support and trust. In the future, we will do better.

Welcome to contact us at any time.

Inquiry Cart 0